Built for a stronger tomorrow.
Direct-to-consumer ADU kits engineered for helical screw piles and a more deliberate path from foundation to structure.
- Frame target
- <72h
- Structure
- Steel
- Foundation
- Piles
Built with a clearer sequence
Big possibilities. Faster.
Site-aware
Designed around the helical screw pile foundation strategy.
Scope-forward
Clear kit details help you plan before steel ships.
Assembly-minded
An efficient structural sequence starts with precise components.
From site to structure
A more direct path to usable space.
SteelSprint combines a precision-made frame system with a low-disruption pile foundation strategy. Local approvals, utilities, site conditions, and finish work remain project-specific.
Read project FAQ- 01
Choose the footprint
Compare available configurations and select the kit that fits your site, use, and finish plan.
- 02
Prepare the site
Coordinate local approvals, utilities, and a qualified installer for the engineered helical screw pile foundation.
- 03
Receive precision components
Cold-formed steel members arrive organized for a direct, efficient assembly sequence.
- 04
Raise the frame
With site preparation complete and the right crew and equipment in place, the structural kit is designed to assemble in under 72 hours.
Available systems
Start with the right steel kit.
Steel builds freedom
Your next square feet can start in steel.
Explore direct-to-consumer ADU kits engineered for a cleaner foundation strategy and faster structural assembly.