SteelSprint ADU structure
Cold-formed steel ADUs

Built for a stronger tomorrow.

Direct-to-consumer ADU kits engineered for helical screw piles and a more deliberate path from foundation to structure.

Frame target
<72h
Structure
Steel
Foundation
Piles

Built with a clearer sequence

Big possibilities. Faster.

Site-aware

Designed around the helical screw pile foundation strategy.

Scope-forward

Clear kit details help you plan before steel ships.

Assembly-minded

An efficient structural sequence starts with precise components.

From site to structure

A more direct path to usable space.

SteelSprint combines a precision-made frame system with a low-disruption pile foundation strategy. Local approvals, utilities, site conditions, and finish work remain project-specific.

Read project FAQ
  1. 01

    Choose the footprint

    Compare available configurations and select the kit that fits your site, use, and finish plan.

  2. 02

    Prepare the site

    Coordinate local approvals, utilities, and a qualified installer for the engineered helical screw pile foundation.

  3. 03

    Receive precision components

    Cold-formed steel members arrive organized for a direct, efficient assembly sequence.

  4. 04

    Raise the frame

    With site preparation complete and the right crew and equipment in place, the structural kit is designed to assemble in under 72 hours.

Available systems

Start with the right steel kit.

View all kits

Steel builds freedom

Your next square feet can start in steel.

Explore direct-to-consumer ADU kits engineered for a cleaner foundation strategy and faster structural assembly.

Find your ADU